A can complete a task in 16 days and B is 4 times faster than A. Find the part of work done by both A and B together in 1 day.
A can complete a task in 16 days and B is 4 times faster than A. Find the part of work done by both A and B together in 1 day.
A$$\frac{5}{8}$$
B$$\frac{3}{16}$$
C$$\frac{5}{16}$$
D$$\frac{3}{20}$$
All DiscussionsClick here to write answer
correct answer is: option c) 516
Explanation: First, find B's work rate. Since B is 4 times faster than A, B takes 1/4 the time A takes to complete the work.
Therefore B can complete the work in 16/4 = 4 days.
A's work rate is 116 per day, and B's work rate is 14 per day.
Together, their work rate is 116+14=116+416=516.
- Option a: 58 is incorrect. This value is much higher than what A and B can do together in a day.
- Option b: 316 is incorrect. This is not the correct sum of the individual work rates.
- Option c: 516 is correct. This is the sum of A's and B's work rate per day.
- Option d: 320 is incorrect. This value is obtained by the wrong calculation.